Full new electrical installations in Barcelona
In a full renovation or a new-build, the electrical installation is designed once and has to last for decades. We plan the entire circuit — power, number of lines, fuse box location, planned automation — before running the first cable, coordinating with every other trade on site.

How we handle this service
Electrical project design
Power needs, number of circuits and the best fuse box location for how each room is actually used.
Full installation work
Chasing, conduit, cabling, switches and lighting, with photographic progress tracking.
Coordination with other trades
Working alongside builders, plumbers and HVAC installers to avoid rework and clashing systems.
Full legalisation
Technical documentation and full paperwork handling to register the new installation with the utility.
Got an electrical emergency right now?
We answer 24h, including holidays. A real electrician on the phone, not a voicemail.
Available across Barcelona
Priority response in the upper districts and the Eixample.
Frequently asked questions
At what stage of the build do you come in?
Ideally at the chasing stage, before plastering, though we also adapt to already-advanced building work.
Do you handle lighting design too?
Yes, we plan lighting points, independent circuits per zone and provision for future automation.
How long does a full installation for a typical flat take?
As a rough guide, a mid-sized flat's electrical work usually takes several weeks to complete.