03 · Built right, from scratch

Full new electrical installations in Barcelona

In a full renovation or a new-build, the electrical installation is designed once and has to last for decades. We plan the entire circuit — power, number of lines, fuse box location, planned automation — before running the first cable, coordinating with every other trade on site.

Electrical installation with protected connections during a build in Barcelona
What's included

How we handle this service

Electrical project design

Power needs, number of circuits and the best fuse box location for how each room is actually used.

Full installation work

Chasing, conduit, cabling, switches and lighting, with photographic progress tracking.

Coordination with other trades

Working alongside builders, plumbers and HVAC installers to avoid rework and clashing systems.

Full legalisation

Technical documentation and full paperwork handling to register the new installation with the utility.

Got an electrical emergency right now?

We answer 24h, including holidays. A real electrician on the phone, not a voicemail.

Call: 672 34 69 22WhatsApp
Common questions

Frequently asked questions

At what stage of the build do you come in?

Ideally at the chasing stage, before plastering, though we also adapt to already-advanced building work.

Do you handle lighting design too?

Yes, we plan lighting points, independent circuits per zone and provision for future automation.

How long does a full installation for a typical flat take?

As a rough guide, a mid-sized flat's electrical work usually takes several weeks to complete.

Other services
⚡ CallWhatsApp